Record Series: | Scrapbooks and Albums |
---|---|
Collection: | Washington Emergency Relief Administration, Division 2 Works Project Summaries, 1934-1945 |
County: | Statewide |
Reference Number: | AR55-1-0-8_p0036 |
---|---|
Subject Start Date: | 1934 |
Subject End Date: | 1934 |
Notes: | Image shows a low block wall and a set of outdoor stairs leading down a dirt slope from a building. Other buildings are visible in the background. "State of Wash. E. R. A. Dist. #2 / Project #17-B4-47 / Neg. #648. 12-18-34." -- handwritten on recto in lower left-hand corner. "B. F. Day School. / Catch basin above steps eliminating wash. Brow of terrace protected with roll curbing.- See Neg. #553." -- handwritten on recto in bottom center. "K.N." -- handwritten on recto in lower right-hand corner. "B. F. Day School / (30) Operations at this Seattle Grade School included construction of a concrete retaining wall of broken concrete, regrading and removal of the drainage system to another location." --on typewritten note attached to verso. |
Subject Terms: |
;
Schools
|
Genre Terms: | Photographic prints |
Extent: | 1 photographic print : b&w ; 8.5 x 9.75 in. (8 x 9.75 in. after disbinding) |
Container: | Box 1, 92-A-97 |
People Terms: |
Source: | /Record/View/07B339BD3D6BF764EEDBDFF927702AAE |
---|