Record Series: | Scrapbooks and Albums |
---|---|
Collection: | Washington Emergency Relief Administration, Division 2 Works Project Summaries, 1934-1945 |
County: | Statewide |
Reference Number: | AR55-1-0-8_p0062 |
---|---|
Subject Start Date: | 1934 |
Subject End Date: | 1934 |
Notes: | Image shows a light-colored building and several men with shovels on and near a flatbed truck. Trees are visible in the background, and the foreground is an open, sandy field. "State of Wash. E.R.A. Dist. #2 / 17-B4-62 Neg # 493 Sep. 6 1934 / Juanita School Dist. #1 / Filling in and Leveling of Field" -- handwritten on recto in lower left-hand corner. "K.N." -- handwritten on recto in lower right-hand corner. "Juanita School / (15) Improvements made at the Juanita School, which included filling in and leveling the grounds, approximated an expenditure of $2,528.00 for WERA wages and $238.84 for men and equipment. The Sponsor spent $52.00 for wages; $89.50 for equipment and $1,360.48 for materials." -- on typewritten note attached to verso. |
Subject Terms: |
;
Shovels
;
Sand
|
Genre Terms: | Photographic prints |
Extent: | 1 photographic print : b&w ; 8.5 x 9.75 in. (8 x 9.75 in. after disbinding) |
Container: | Box 1, 92-A-97 |
People Terms: |
Source: | /Record/View/AD95368A7207A29BFF6EA9378F863240 |
---|