Record Series: | Scrapbooks and Albums |
---|---|
Collection: | Washington Emergency Relief Administration, Division 2 Works Project Summaries, 1934-1945 |
County: | Statewide |
Reference Number: | AR55-1-0-8_p0188 |
---|---|
Subject Start Date: | 1934 |
Subject End Date: | 1934 |
Notes: | Image shows men working with concrete boxes next to a building with a partially walled shed. A picket fence and buildings are visible in the background. "State of Wash. E. R. A. Dist. #2 / Proj. 17-B10-50 / Neg. 641 12-13-34" -- handwritten in lower left-hand corner on recto. "Redmond / Making Concrete Water Boxes / KN" -- handwritten in lower right-hand corner on recto. "Redmond Pipe Line / (84) Making concrete water boxes for use in the Redmond Pipe Line job. This improvement, like the Auburn Water System, was constructed with a combination of funds contributed by State Grant-in-Aid, WERA and the Town of Redmond. Included in the operation was the laying of 12,000 lineal feet of 4 inch cast iron pipe." -- on typewritten note attached to verso. |
Subject Terms: |
;
Sheds
|
Genre Terms: | Photographic prints |
Extent: | 1 photographic print : b&w ; 8.5 x 9.75 in. (7.5 x 9.75 in. after disbinding) |
Container: | Box 1, 92-A-97 |
People Terms: |
Source: | /Record/View/ADB88EA16046C8564C37B05B58653BE3 |
---|